Funktionen DatePart returnerar en viss del av ett datum.
Syntax:
DatePart (interval As String, date As Date [, firstDayOfWeek As Integer [, firstWeekOfYear As Integer]]) As Long
Returvärde:
The extracted part for the given date.
Parametrar:
interval - A string expression from the following table, specifying the date interval.
interval (string value)
Förklaring
yyyy
År
q
Kvartal
m
Månad
y
Dagen på året
w
Weekday
ww
Vecka på året
d
Dag
h
Hour
n
Minute
s
Second
date - The date from which the result is calculated.
Date literals allow to specify unambiguous date variables that are independent from the current language. Literals are enclosed between hash signs #. Possible formats are:
#yyyy-mm-dd#
#mm/dd/yyyy#
firstdayofweek: An optional parameter that specifies the starting day of a week.
firstdayofweek value
Förklaring
0
Använd systemets standardvärde
1
Söndag (standardvärde)
2
måndag
3
Tisdag
4
Onsdag
5
Torsdag
6
Fredag
7
Lördag
firstweekofyear: An optional parameter that specifies the starting week of a year.
firstweekofyear value
Förklaring
0
Använd systemets standardvärde
1
Vecka 1 är den vecka där den 1 januari infaller (standardvärde)
2
Vecka 1 är den första veckan som innehåller fyra eller fler dagar på det året
3
Vecka 1 är den första veckan som enbart innehåller dagar under det nya året
Exempel:
Sub example_datepart
MsgBox DatePart("ww", #01/02/2005#) ' displays 2 because weeks start on Sunday
MsgBox DatePart("ww", #12/31/2005#) ' displays 53
MsgBox DatePart(date:=#2005-12-30#, interval:="q") ' displays 4
End Sub