Funktsioon DatePart tagastab kuupÀeva mÀÀratud osa.
SĂŒntaks:
DatePart (interval As String, date As Date [, firstDayOfWeek As Integer [, firstWeekOfYear As Integer]]) As Long
TagastusvÀÀrtus:
The extracted part for the given date.
Parameetrid:
interval - A string expression from the following table, specifying the date interval.
interval (string value)
Selgitus
yyyy
Aasta
q
Kvartal
m
Kuu
y
PĂ€ev aastas
w
NÀdalapÀev
ww
NĂ€dal aastas
d
PĂ€ev
h
Tund
n
Minut
s
Sekund
date - The date from which the result is calculated.
Date literals allow to specify unambiguous date variables that are independent from the current language. Literals are enclosed between hash signs #. Possible formats are:
#yyyy-mm-dd#
#mm/dd/yyyy#
firstdayofweek: An optional parameter that specifies the starting day of a week.
firstdayofweek value
Selgitus
0
Kasutatakse sĂŒsteemi vaikevÀÀrtust
1
PĂŒhapĂ€ev (vaikimisi)
2
EsmaspÀev
3
TeisipÀev
4
KolmapÀev
5
NeljapÀev
6
Reede
7
LaupÀev
firstweekofyear: An optional parameter that specifies the starting week of a year.
firstweekofyear value
Selgitus
0
Kasutatakse sĂŒsteemi vaikevÀÀrtust
1
NÀdal 1 on nÀdal, mis sisaldab kuupÀeva 1. jaanuar (vaikimisi)
2
NÀdal 1 on nÀdal, mis sisaldab aasta nelja vÔi enamat pÀeva.
3
NÀdal 1 on nÀdal, mis sisaldab ainult alanud aasta pÀevi.
NĂ€ide:
Sub example_datepart
MsgBox DatePart("ww", #01/02/2005#) ' displays 2 because weeks start on Sunday
MsgBox DatePart("ww", #12/31/2005#) ' displays 53
MsgBox DatePart(date:=#2005-12-30#, interval:="q") ' displays 4
End Sub